AWTP-Thickener and Washwater Tank Pumps Replacement

703 River Bend Road | Macon, GA The Project includes all labor, materials, equipment, tools and incidentals required for the installation (replacement) of four (4) Progressive Cavity Pumps (direct drive) and Motors. THE INVITATION TO BID FORM BELOW CANNOT BE USED FOR THIS BID.  PLEASE REFER TO THE PLAN DOCUMENTS…

View Bid

Town Creek Reservoir Dam Down Drain Repairs

The scope of work consists of furnishing all labor, materials, tools, equipment and incidentals and performing all operations in connection with repairing the down drain and right abutment drain at…

View Bid

Replace 4160v Gear & MCC at Lower Poplar WWTP Blower Building

The Project consists of removal and replacement of 4160v switchgear serving blowers.  Removal and replacement of motor control center. New electrical equipment to be relocated to adjacent room. Miscellaneous Architectural…

View Bid

GDOT PI M006497 Lower and Raise Manholes and Valves

This bid has closed.

The Project consists of all labor, materials, tools, equipment and incidentals in performing all operations in connection with lowering and raising manholes and valves along 4.35 miles on SR 74…

View Bid

Large Meter and Advanced Metering Infrastructure (AMI) Device Installation

This bid has closed.

The Project consists of labor services to install approximately 2,200 water meters within the Owner’s service area. The Owner is purchasing the AMI system hardware through a separate agreement with Neptune Technology Group. THE INVITATION TO BID FORM BELOW CANNOT BE USED FOR THIS RFP.  PLEASE REFER TO THE RFP…

View Bid
1 2 3